Portfolio: NHS Lothian | Royal Edinburgh Hospital
Client: NHS Lothian
Project Value £135,000
Project Timescale: 6 Weeks
Dates: March 2023 – May 2023
PROJECT DESCRIPTION
EC Specialist Contractors delivered a project at The Royal Edinburgh Hospital to create a New Switchroom, providing upgraded LV electrical services to facilitate future refurbishment and alterations to the Kitchen and Dining facilities within the MacKinnon House building, Morningside Place Edinburgh.
The works included:
- the isolation, removal and relocation of existing M&E services (electrical, plumbing, drainage and extract ventilation) to the kitchen.
- Strip out of existing kitchen fitments fixtures, including the breaking out of concrete plinths.
- Formation of a new door opening through a 750mm thick stone/masonry wall involving a designed temporary works propping system.
- New partitioning and gyp Ceiling shaft system ceiling to create a fire compartment forming the new electrical switchroom including integral steel support frame structure
- Alterations to existing suspended ceiling system to form a new bulkhead forming containment to the new electric supply cables throughout the existing canteen.
- Installation of 2 new sub mains cables and containment above ceilings run 75m throughout the existinh hospital rooms and corridors.
- A full power shutdown of existing services affecting many essential services within the hospital.
- New power, lighting, emergency lighting, smoke detection, fire alarm installations and extract ventilation.
- Installation of a galvanised steel Cat Ladder to provide roof access.
- New fire doors, hygienic wall cladding, ceramic floor tiling and decoration.
In addition to the project being carried out in a live 24/7 hospital, the kitchen facility and canteen remained in full operation throughout the entirety of the works, seven days a week requiring the majority of the project works being undertaken out of hours.
Despite a number of design and logistical challenges, all of which were collaboratively overcome, the project was successfully delivered to the highest quality, within budget and handed over defect free for a very satisfied client.